It’s done, the de-construction of the the bedroom is finished, Marion and I have stripped the room completely, dug a trench for the drains ready for theĀ en-suite bathroom.
This weekend consisted of moving the piles of concrete from the room to the hired skip. We have the plumber coming in on Monday to lay the drains for the shower, sink and toilet. Wahoo the bedroom is starting to be built.
Recent Comments